免费午夜不卡毛片-亚洲一区二区三区偷拍女-99精品日韩一区二区三区-亚洲欧美另类天堂-日韩av免费精品-一本色道久久亚洲av蜜桃-欧美麻豆精品久久久久

Jiangmen hardware accessories factory analyzes its mold processing process arrangement

2019-12-29 1634

  Mold making refers to the processing of forming and blank making tools, in addition to shear mold and die-cutting mold. Generally, the mold has two parts: upper mold and lower mold. The steel plate is placed between the upper and lower dies to realize the material forming under the action of the press. When the press is opened, the workpiece determined by the die shape will be obtained or the corresponding waste materials will be removed. As small as electronic connector, as large as the automobile dashboard, the workpiece can be molded with mold. Progressive die refers to a set of die which can automatically move the workpiece from one station to another and get the forming parts at the last station. Die processing technology includes: cutting die, blanking die, compound die, extrusion die, four slide die, progressive die, stamping die, die cutting die, etc.

  Process flow arrangement

  1. Bottom surface processing, processing quantity guarantee;

  2. Casting blank datum alignment, 2D and 3D mold surface allowance inspection;

  3. Rough machining of 2D and 3D profile, non installation non working plane (including safety platform surface, buffer installation surface, pressing plate plane and side datum plane);

  4. Before semi finishing, the side datum should be aligned correctly to ensure the accuracy;

  5. Semi finish machining of 2D and 3D profile, finish machining of all kinds of installation working surfaces (including limit block installation surface and contact surface, insert installation surface and back side, punch installation surface, waste cutter installation surface and back side, spring installation surface and contact surface, all kinds of travel limit working surface, wedge installation surface and back side), semi finish machining of all kinds of guide surfaces and guide holes, leaving allowance for finish machining process Datum hole and height datum, and record data;

  6. Check and recheck the machining accuracy;

  7. Fitter setting process;

  8. Before finishing, align the reference surface of the process reference hole and check the allowance of the insert;

  9. Finish machining profile 2D, 3D, side punching profile and hole position, finish machining process reference hole and height reference, finish machining guide surface and guide hole;

  10. Check and recheck the machining accuracy.

  Jiangmen hardware accessories factory http://molizone.cn//


欧美激情性A片在线观看 | 欧美人与动牲性行为视频 | 法国新片《爱恋》尺度很大 | 91青青青国产在线观看免费2019 | 麻豆一区二区在我观看 | 亚洲欧美日韩综合在线观看 | 强行挺进美艳老师的后臀 | 免费一级特黄欧美大片久久网 | 久久精品久久久精品美女 | 色婷婷综合激情中文在线 | 澳门永久av免费网站 | 无套内射在线无码播放 | 日韩欧美一区二区三区久久婷婷 | 日韩精品人成在线播放 | 456性欧美在钱视频 日本妇人成熟A片免费观看 | 一区二区三区精品视频 | 国产91av在线播放网站 | 欧美制服丝袜国产日韩一区 | 亚洲一区二区三区免费 | 扒开老师大腿猛进AAA片软件 | 荡娃艳妇有声小说 | 中文字幕一级毛片无码视频 | 免费看男女下面日出水视频 | 中文字幕久久久久久久免费 | 中文字幕亚洲无线码 | 成人国产999视频在线观看 | 欧美.日韩.日本国产视频 | 精品少弄得99久久精品区别 | 免费A级毛片无码鲁大师 | 又湿又紧又大又爽又A视频 一二三四社区在线中文视频 | 欧美成a人片免费看久久 | 亚洲成年人免费网站 | 在线观看黄色视频网站 | 精品国语对白清晰在线 | 国产精品第100页 | 18禁无遮挡羞羞污污污污网站 | 欧美制服丝袜国产日韩一区 | 狼人久蕉在线播放 | 国产精品乱码久久久久久小说 | 荡公乱妇HD电影中文字幕 | 最美情侣高清免费观看在线 |